ST2ProfilePowered This request is listed at

Buying company and request details are not available without login

Choose from the list:

NO-Tromsø: construction work

Summary

Renovation county road 868 Pollfjell tunnel.
The tunnel is situated on county road 868 just north of Furuflaten in
Lyngen municipality. The tunnel has tunnel class B, two way traffic in one
tunnel and is 3 230 m, including portals. The profile is T5.5 and the
annual amount of daily traffic is approx. 600.
The work in phase 1 consists of renovation of 600 m from the tunnel
opening towards Furuflaten and northwards in the tunnel. The work involves
disassembling and removal of the existing PE foam, expansion of the
profile to T8.5, permanent rock protection, water and frost protection
with fire protection, laying new drains, road development, laying cover,
one technical building, new electronic installations with guidelines as
well as the assembly of 4 fans.
Removal of the existing PE foam: Approx. 4 500 m2.
Blasting for profile expansion, technical building and breakdown areas: 22
000 m3.
New water and frost protection: Approx. 12 000 m2.
NOTE: To register your interest in this notice and obtain any additional
information please visit the Doffin Web Site at
http://www.doffin.no/Search/Search_Switch.aspx?ID=248892.
CPV: 45000000.